Editorial Calendar Template for a Small Website

A notepad with a planner and a keyboard in the background

An editorial calendar connects content ideas to the work needed to publish them. Dates are useful, but they are not enough: someone also needs to know why an article exists, what it depends on, and who reviews it.

Use the following structure in a spreadsheet, shared document, or task board. Start with a small number of realistic assignments.

Copy the calendar fields

FieldWhat to record
Article IDA stable internal reference
Working titleThe specific proposed subject
SectionThe intended site collection
Reader taskThe problem the article solves
OwnerPerson responsible for progress
StatusCurrent stage of work
DependencyMissing source, asset, or decision
Target dateAn agreed planning date
ReviewerPerson checking the draft
Published URLThe real address after publication
Review triggerA date or event requiring another check

Keep the published URL empty until the address is known. Do not use an invented URL as if the article already exists.

Choose statuses with clear meaning

A simple sequence could be Idea, Brief Ready, Drafting, Review, Ready, Published, and Needs Update.

Define the difference between Drafting and Review. A writer should not move an article into Review while major factual gaps remain unmarked.

Add a separate blocker field rather than creating a new status for every possible delay.

Prioritize the site structure

For a new website, identify the pages and topic collections that visitors will reach from the main navigation. Prepare the articles needed to make those collections useful before filling a general blog with disconnected ideas.

For an illustrative technology site, that might mean a WordPress foundation guide, a hosting explanation, and a small set of practical tutorials.

This is an editorial planning choice, not a claim that every new site requires the same sequence.

Plan for actual capacity

Estimate writing, research, editing, image preparation, and publishing work. A schedule that counts only drafting time usually hides the rest of the process.

If one reviewer handles every article, that review capacity can limit the schedule even when drafts are produced quickly.

Leave room for corrections and updates. Existing material should not become inaccurate while all attention goes to new posts.

Review the calendar regularly

During a short review, ask which items are blocked, which have lost relevance, and which duplicate another assignment.

Move dates when evidence changes. Do not publish an incomplete guide solely because a calendar cell says it is due.

Record the reason for significant changes so the team can distinguish a deliberate decision from forgotten work.

Keep a separate idea backlog

Ideas that have not been researched or approved belong in a backlog. Moving an item into the active calendar should mean someone has checked its purpose and priority.

Limit the active work to a manageable amount. A calendar with hundreds of “in progress” entries offers little guidance.

The useful result is a visible flow from a reader need to a reviewed article, with enough context for another person to understand what happens next.